The project is at Manchester Airport (Airside), and involves the strip out and replacement of 2 HV substations, including minor civil works and subcontract packages.
Electrically qualified with HV experience and either SMSTS or SSSTS is required, with Microsoft Project and Primavera P6 experience advantageous.
This project is part of our wider airport operations, and a great opportunity to work with ourselves on this Framework with this excellent and progressive client.
A DBS check is reqiuired to be undertaken - You must have been continuously resident in the UK for at least the last 5 Years, and be able to get a letter/document from each previous employer in that time confirming the dates to and from you were employed, without significant gaps in that period.
WHGood is an equal opportunities employer.