PTS Electricians needed to jump on Railway project.
Farncombe to Petersfield
Requriements:
- 18th edition
- PTS
- ECS/JIB
Outline of work:
- Installation of new 3kva transformer within the new FSP already on-site
- The 3kva transformer will either be swapped for a 1.5kva transformer or if there is enough space within the FSP the transformer and associated wiring shall be installed
- The purpose of the new transformer is to change the existing SMIEOH DB from IT to TN system
- Installation of a new 1cu10mm earth cable between the FSP and SMIEOH DB
- Installation of a new 1cu35mm earth cable between the FSP earth bar and SMIEOH earth bar
- Undertake Telecom Rack Battery Installation
- Undertake Telecom Rack Battery Cable Testing
- Undertake Telecom Rack Battery Discharge Testing
- Undertake Telecom Rack Battery Impedance and Voltage Measurements Test
- Carry out an alteration to an existing circuit certificate and relevant testing associated with this
For more information please contact Fred Kilburn at (phone number removed)