Production Scheduler
Goole, UK
Long Term
100% Onsite
Required Skills
- Extensive experience of assembly line scheduling
- Need a Planner who does scheduling for production Engineering
- Experience of resource planning
- Competent in all Microsoft tools, SAP, MS Project and Primavera competence.
- Responsible for the creation and ongoing updating of detailed production schedules for an assembly line based on project requirements.
- Controls and monitors production to ensure a smooth throughput of the production orders, taking into account the optimum use of the
- resources.
Tasks
- Creation of production schedules based on the overall project schedule
- Controls the production sequences, in order to reach an optimum use of the resources with eUective resource planning
- Track progress of production orders
- Implementation of measurement criteria and control
- Records or monitors workflow (completion reports), in order to map the current production status
- Target/actual comparison of the dates based on the actual reports
- Detection of schedule deviations
- Development of schedule control measures
- Works on coordinating material movements between production units, to ensure an optimum production run.
Interfaces
- Assembly management
- Project planner
- Project management
- Quality
- Logistics